Project details
- New design of anchors and tensioning system
- Design of several tooling for replacing damaged suspension points in the splash zone.
- Full scale testing at Dora Subsea Test Center.
- Complex rigging operations.
- Vertical Access Tool used for underwater operations.
- New RPN dimension of 12 x 114 meters. Installed at 6 meters above surface to 6 meters below surface.
- No use of divers, ROV or support vessels.