Clamp and I&J tube installation, Australia

Tie-in of new wells to the platform. Installation of tubes for the new production risers.


Project details

  • Design of subsea clamps. 
  • Installation method for Clamps and Tubes. 
  • Vertical Access Tool, design, testing and installation offshore.
  • Tube Clamps installed at -13 m.
  • 15 m long tubes installed, supported by the clamps and with the use of Vertical Access Tool.
  • No use of divers, ROV or support vessels.