Year Client Installation Scope

 

 

 

 

2001

Statoil

Heidrun

Riser repair, Cofferdam

2003

ConocoPhillips

Ekofisk

Removal of riser protector

2003

ConocoPhillips

Ekofisk

Brace and structural reinforcement, design of splash zone clamp

2004

Subsea 7 / ConocoPhillips

Ekofisk X

Subsea cleaning of conductor and clamp installation

2006

Statoil

Kristin

Anchor chain inspection

2006

Aker Solutions

Frigg DP2

Boat bumper removal

2007

ConocoPhillips

Ekofisk

Splash zone/subsea clamp design and installation

2007

Statoil

Norne

Hull reinforcement subsea -14m

2007

ConocoPhillips

Ekofisk Charlie

Design and installation of riser protector

2007

ConocoPhillips

Ekofisk Bravo

Design and installation of riser protector

2008

ConocoPhillips

Eldfisk A

Cutting and removal of caisson

2008

Aker

Frigg DP2

Assistance with preparations and installation of BTA's on the Frigg DP2 jacket structure

2009

ConocoPhillips

Ekofisk W

Design and installation of splash zone clamp

2009

ConocoPhillips

Ekofisk Bravo

Corrosion protection on 18’’ riser by use of cofferdam

2009

Aker Offshore Partner / Statoil

Snorre B

Installation of corrosion protection (anodes) at 12m below sea level

2009

ConocoPhillips

Ekofisk W

Removal of conductor guide frame

2010

ConocoPhillips

Ekofisk

FMD inspection on several platforms on the Ekofisk complex

2010

ConocoPhillips

Ekofisk Charlie

Corrosion protection on 18’’ riser by use of cofferdam

2010

Statoil

Njord A

Installation of corrosion protection (anode frames) at 6m below sea level

2010

ConocoPhillips

Ekofisk W

Design of tooling and straitening of a conductor

2010

ConocoPhillips

Ekofisk A

Installation of subsea conductor centralizer

2011

Shell UK

Brent A & B

Boat fender inspection and removal

2012

Aker Solutions

Åsgard B

Design of subsea habitat (Cofferdam)

2012

NAM

K14-FA1 & K8-FA-PP1

Subsea cleaning and visual inspection weld inspection

2013-2015

Woodside

North Ranking Alpha

Inspection of wall thickness at the platform legs in splash zone & Cofferdam design

2012

ConocoPhillips

Ekofisk FTP

Subsea clamp visual inspection and flooded member detection (FMD)

2014

ConocoPhillips

Bayu Undan

Installation of subsea clamps and tie-in tubes

2014

ConocoPhillips

Ekofisk FTP

Removal of damaged caisson by subsea lifting frame

2014

Aker Solutions / Talisman

Yme

Cutting with diamond wire saw inside platform legs

2015

SEIC

PA-B

Splash zone concrete rehabilitation with VAT

2015

BP

Atlantis

Marine growth cleaning on wet spools

2015

ConocoPhillips

Eldfisk FTP

Removal of caisson -12 to +6m, subsea rigging

2015

Maersk

Tyra East and West

Design of tool. Subsea ACFM inspection.

2016

BP

Tambar

Clean and inspect riser in the splash zone, installation of epoxy system by remotely operated equipment

2016

NAM

Leman E

Removal of caisson, subsea rigging

2017-2018

ConocoPhillips

Ekofisk

Design of tool. Subsea ACFM inspection.

2017-2018

Aker Solutions / Statoil

Kvitebjørn

Removal of caisson, subsea rigging

2017-2018

Teekay

Petrojarl Banff

Subsea inspection of mooring chains FPSO

2018

Hess Denmark

South Arne

Riser, cleaning, inspection and wrapping repair in splash zone

2019

Hess Denmark

South Arne

Jacket leg, cleaning and inspection in splash zone

2019

Equinor

Heidrun

Study - Replacement of Splash Zone Riser net

2019

Statens Vegvesen

E39 Bjørnafjorden

Study - Pontoon inspection and maintenance

2019

Equinor

Heidrun

Repair of riser net planning and field management

2019-2020

SocarCape

West Azeri

Mobilization of VAT and PEC scanning (interrupted before offshore.)

2019-2021

Equinor

Snorre A

RPN Fairlead change out - 8m

2019-2020

ConocoPhillips

Ekofisk Field

Development of Inspection Robot for ACFM - crack detection

2019-2020

Norway Royal Salomon

Arctic Offshore Farming

Management of Marine Operations

2020-2022

Equinor

Heidrun

Replacement of Splash Zone Riser Protection Net (Vest Net)

2021

ConocoPhillips

Eldfisk E

Cleaning of caissons down to -13m and cutting if stud bolts

2021

Lateral

Sleipner

Plugging of drain-line at -14m

2022

Aker Solutions

Oseberg

caisson replacement

2022

Dykkerteknikk

Seagreen Offshore

Shallow water cable laying (trenching). Wind farm.

2022

Equinor

Norne field

Anchor chain cleaning tool

2022-2023

Equinor

Njord field

Anchor chain cleaning tool

2023

Aker Solutions

Oseberg

caisson replacement

2023

Woodside

 

Study Rigging/RAT procedure HSE

2023

Dykkerteknikk

Tennet offshore wind farm

Shallow water cable laying (trenching)

2023

ConocoPhillips

Ekofisk N & M

caisson inspection

2023

Equinor

Snorre A

Study Tension rod seal ring repair

2023

Equinor

Åsgard B

Study Riser Net replacement

2023

Equinor

Åsgard B

Repair riser net

2023

Equinor

Åsgard B

Ventilation box design and installation

2023

SBM

Liza Unity

Riser hang-off clamp cleaning