Year | Client | Installation | Scope |
|
|
|
|
2001 |
Statoil |
Heidrun |
Riser repair, Cofferdam |
2003 |
ConocoPhillips |
Ekofisk |
Removal of riser protector |
2003 |
ConocoPhillips |
Ekofisk |
Brace and structural reinforcement, design of splash zone clamp |
2004 |
Subsea 7 / ConocoPhillips |
Ekofisk X |
Subsea cleaning of conductor and clamp installation |
2006 |
Statoil |
Kristin |
Anchor chain inspection |
2006 |
Aker Solutions |
Frigg DP2 |
Boat bumper removal |
2007 |
ConocoPhillips |
Ekofisk |
Splash zone/subsea clamp design and installation |
2007 |
Statoil |
Norne |
Hull reinforcement subsea -14m |
2007 |
ConocoPhillips |
Ekofisk Charlie |
Design and installation of riser protector |
2007 |
ConocoPhillips |
Ekofisk Bravo |
Design and installation of riser protector |
2008 |
ConocoPhillips |
Eldfisk A |
Cutting and removal of caisson |
2008 |
Aker |
Frigg DP2 |
Assistance with preparations and installation of BTA's on the Frigg DP2 jacket structure |
2009 |
ConocoPhillips |
Ekofisk W |
Design and installation of splash zone clamp |
2009 |
ConocoPhillips |
Ekofisk Bravo |
Corrosion protection on 18’’ riser by use of cofferdam |
2009 |
Aker Offshore Partner / Statoil |
Snorre B |
Installation of corrosion protection (anodes) at 12m below sea level |
2009 |
ConocoPhillips |
Ekofisk W |
Removal of conductor guide frame |
2010 |
ConocoPhillips |
Ekofisk |
FMD inspection on several platforms on the Ekofisk complex |
2010 |
ConocoPhillips |
Ekofisk Charlie |
Corrosion protection on 18’’ riser by use of cofferdam |
2010 |
Statoil |
Njord A |
Installation of corrosion protection (anode frames) at 6m below sea level |
2010 |
ConocoPhillips |
Ekofisk W |
Design of tooling and straitening of a conductor |
2010 |
ConocoPhillips |
Ekofisk A |
Installation of subsea conductor centralizer |
2011 |
Shell UK |
Brent A & B |
Boat fender inspection and removal |
2012 |
Aker Solutions |
Åsgard B |
Design of subsea habitat (Cofferdam) |
2012 |
NAM |
K14-FA1 & K8-FA-PP1 |
Subsea cleaning and visual inspection weld inspection |
2013-2015 |
Woodside |
North Ranking Alpha |
Inspection of wall thickness at the platform legs in splash zone & Cofferdam design |
2012 |
ConocoPhillips |
Ekofisk FTP |
Subsea clamp visual inspection and flooded member detection (FMD) |
2014 |
ConocoPhillips |
Bayu Undan |
Installation of subsea clamps and tie-in tubes |
2014 |
ConocoPhillips |
Ekofisk FTP |
Removal of damaged caisson by subsea lifting frame |
2014 |
Aker Solutions / Talisman |
Yme |
Cutting with diamond wire saw inside platform legs |
2015 |
SEIC |
PA-B |
Splash zone concrete rehabilitation with VAT |
2015 |
BP |
Atlantis |
Marine growth cleaning on wet spools |
2015 |
ConocoPhillips |
Eldfisk FTP |
Removal of caisson -12 to +6m, subsea rigging |
2015 |
Maersk |
Tyra East and West |
Design of tool. Subsea ACFM inspection. |
2016 |
BP |
Tambar |
Clean and inspect riser in the splash zone, installation of epoxy system by remotely operated equipment |
2016 |
NAM |
Leman E |
Removal of caisson, subsea rigging |
2017-2018 |
ConocoPhillips |
Ekofisk |
Design of tool. Subsea ACFM inspection. |
2017-2018 |
Aker Solutions / Statoil |
Kvitebjørn |
Removal of caisson, subsea rigging |
2017-2018 |
Teekay |
Petrojarl Banff |
Subsea inspection of mooring chains FPSO |
2018 |
Hess Denmark |
South Arne |
Riser, cleaning, inspection and wrapping repair in splash zone |
2019 |
Hess Denmark |
South Arne |
Jacket leg, cleaning and inspection in splash zone |
2019 |
Equinor |
Heidrun |
Study - Replacement of Splash Zone Riser net |
2019 |
Statens Vegvesen |
E39 Bjørnafjorden |
Study - Pontoon inspection and maintenance |
2019 |
Equinor |
Heidrun |
Repair of riser net planning and field management |
2019-2020 |
SocarCape |
West Azeri |
Mobilization of VAT and PEC scanning (interrupted before offshore.) |
2019-2021 |
Equinor |
Snorre A |
RPN Fairlead change out - 8m |
2019-2020 |
ConocoPhillips |
Ekofisk Field |
Development of Inspection Robot for ACFM - crack detection |
2019-2020 |
Norway Royal Salomon |
Arctic Offshore Farming |
Management of Marine Operations |
2020-2022 |
Equinor |
Heidrun |
Replacement of Splash Zone Riser Protection Net (Vest Net) |
2021 |
ConocoPhillips |
Eldfisk E |
Cleaning of caissons down to -13m and cutting if stud bolts |
2021 |
Lateral |
Sleipner |
Plugging of drain-line at -14m |
2022 |
Aker Solutions |
Oseberg |
caisson replacement |
2022 |
Dykkerteknikk |
Seagreen Offshore |
Shallow water cable laying (trenching). Wind farm. |
2022 |
Equinor |
Norne field |
Anchor chain cleaning tool |
2022-2023 |
Equinor |
Njord field |
Anchor chain cleaning tool |
2023 |
Aker Solutions |
Oseberg |
caisson replacement |
2023 |
Woodside |
|
Study Rigging/RAT procedure HSE |
2023 |
Dykkerteknikk |
Tennet offshore wind farm |
Shallow water cable laying (trenching) |
2023 |
ConocoPhillips |
Ekofisk N & M |
caisson inspection |
2023 |
Equinor |
Snorre A |
Study Tension rod seal ring repair |
2023 |
Equinor |
Åsgard B |
Study Riser Net replacement |
2023 |
Equinor |
Åsgard B |
Repair riser net |
2023 |
Equinor |
Åsgard B |
Ventilation box design and installation |
2023 |
SBM |
Liza Unity |
Riser hang-off clamp cleaning |