Project details
- Qualification of inspection method (Pulsed Eddy Current).
- Logistics including temporary export of equipment and Visas for employees.
- Installation planning and safety evaluations.
- Vertical Access Tool used.
- Wall thickness inspection of west side main structure in splash zone (+4 to -10 meters).
- Result from inspection that the structural integrity was ok.
- No use of divers, ROV or support vessels.